Pictures 2019

Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: Site inspection with MD Dr. Barth (Head of the Bavarian State Ministry for the Environment and Consumer Protection).

Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: From left to right: Mr. Dr. Steininger, First Mayor of Landau; Mr. Sadgorski, Head of the WWA Landshut; Mr. Haselbeck, District President of the Government of Lower Bavaria; Mr. Dr. Barth, Head of the StMUV Office; Mr. Trapp, District Administrator Dingolfing-Landau; Mrs. Dr. Loibl, Member of the Bavarian Parliament

Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: Inspection of the future tributary of the Isar, still dry feet.

Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: First gravel masses are poured upstream to an island.

Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: The gravel island is slowly getting bigger.

Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: Finished gravel island near Zulling.

Sub-site 5 "coherence priority Landau" - Measure C.1 - C.5: Start of dredging of the tributary.

Sub-site 7 'FFH priority Ettling' - Measure C.16: Growth on the lowland hay meadows sown with threshing material in May 2019

Sub-site 7 'FFH priority Ettling' - Measure C.16: Growth on the lowland hay meadows sown with threshing material in May 2019

Sub-site 7 'FFH priority Ettling' - Measure C.13: Planting of individual site-specific trees on the sown areas for closer interlocking of open-land and forest habitats

Sub-site 7 'FFH priority Ettling' - Measure C.10: Creation of a temporary small water body as a habitat for amphibians

Sub-site 7 'FFH priority Ettling' - Measure C.16: Occurrence of military orchid (Orchis militaris) on the sowing area

Sub-site 1 'FFH priority Loiching' - Measure C.16: Growth on the lowland hay meadows sown with threshing material in July 2019

Sub-site 1 'FFH priority Loiching' - Measure C.16: Growth on the lowland hay meadows sown with threshing material in July 2019
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Condition of the Isar river prior to the beginning of construction work
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Condition of the Isar river prior to the beginning of construction work
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Impressions from the construction site
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Impressions from the construction site
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Progress of construction works in January 2019
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Progress of construction works in January 2019
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Progress of construction works in January 2019
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Progress of construction works in January 2019
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Progress of construction works in January 2019
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: The Isar river becomes accessible and experienceable again.
Sub-site 1 "FFH priority Loiching" - Measure C.1 - C.5: The Isar river becomes accessible and experienceable again.
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: The Isar river bank is made accessible again, flattened and slightly swung.
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Covered sleeping protection.
Sub-site 1 "FFH priority Loiching" - Measures C.1 - C.5: Drone image shortly after completion.
Sub-site 1 "FFH priority Loiching" - Measures C.10: Creation of a temporary small water body as habitat for amphibians..
Sub-site 1 "FFH priority Loiching" - Measures C.19: Installation of small structures; here stacks of dead wood.
Sub-site 1 "FFH priority Loiching" - Measures C.19: Installation of small structures; here stacks of dead wood.
Sub-site 1 "FFH priority Loiching" - Measures C.19: Installation of small structures for the sand lizard.
Sub-site 1 "FFH priority Loiching" - Measures C.6: Ecological upgrading of a rubble drain after completion.
Sub-site 6 "FFH priority Landau" - Measure C.9: New construction of a floodplain watercourse.
Sub-site 7 "FFH priority Ettling" - Measure C.9: New construction and optimisation of an existing floodplain.
Sub-site 3 ´FFH priority Mamming´ - Measure C.12: Curled poplar to enrich standing dead wood.
Sub-site 6 "FFH priority Landau" - Measure C.12: Freshly mulched aisle through the alluvial forest.
Sub-site 6 "FFH priority Landau" - Measure C.12: Freshly mulched larger area with preserved umbrella trees shortly before afforestation.
Sub-site 6 "FFH priority "Landau - Measure C.12: Freshly mulched area before afforestation.
Sub-site 6 "FFH priority Landau" - Measure C.12: Problem of clematis, this extremely vigorous plant "steals" the light from all other plants and trees.
Sub-site 6 "FFH priority "Landau - Measure C.12: Strip-shaped mulched area with freshly afforested trees. The freshly planted trees stand in the green growth protectors.
Sub-site 6 "FFH priority "Landau - Measure C.12: Area of mulched land after afforestation. Since the area was fenced, individual tree protection can be dispensed with here. The individual trees are marked with a Tonkin Cane. This facilitates the maintenance.
Measure E.3: Presentation of LIFE Isar image films at the Munich River Film Festival on 17.02.2019